鶹

Skip to content
schoolconstructionnews_logo

鶹

Design – Construction – Operations

  • Articles
    • Featured Articles
    • News Articles
    • Products
    • People
  • Subscribe
  • About
    • Contact
    • About 鶹
    • Resource Guide
    • Advertising
    • Industry Partnerships
  • Events
    • Design + Construction Symposium
  • Industry Thought Leaders
    • Editorial Advisory Board
  • Submit Content
Search for:
  • Home
  • 2026
  • March
  • Page 2

Latest Posts

  • Lessons in Resilience: Disaster Recovery in Our Schools April 15, 2026
  • Higher Ed Capital Renewal Backlog Rises 8% to $156 Per Gross Square Foot, Report Shows April 14, 2026
  • Students Design Their Own Futures at New STEAM High School April 13, 2026
  • What Rising Safety Concerns Mean for Future School Construction April 7, 2026
  • Vertical Picket Bleacher April 7, 2026
  • Newman University Appoints Aaron Ryder as Director of Facilities April 7, 2026
  • Board Member Spotlight: Aaron Jobson on Energy, Policy and the Evolution of ‘Good School Design’ April 7, 2026
  • San Diego City College Performing Arts Project Enters Schematic Design Phase April 6, 2026
  • LED Downlight April 3, 2026
  • Brendan Kelly Appointed President of Eastern Michigan University April 3, 2026

March 2026

LPA Design Studios has welcomed Lawrence Speck—a respected architect, educator and leader—as a Senior Designer in the firm’s Austin office.
  • People

Lawrence Speck Joins LPA Design Studios

4 weeks ago3 mins

LPA Design Studios has welcomed Lawrence Speck—a respected architect, educator and leader—as a Senior Designer in the firm’s Austin office.

Read More
California’s Office of Environmental Health Hazard Assessment has concluded that crumb rubber infill made from recycled tires is not likely to pose a significant health risk to people who use or watch games on synthetic turf fields.
  • News

California OEHHA Study Finds No Significant Health Risk From Crumb Rubber Infill in Synthetic Turf

4 weeks ago6 mins

California’s Office of Environmental Health Hazard Assessment has concluded that crumb rubber infill made from recycled tires is not likely to pose a significant health risk to people who use or watch games on synthetic turf fields.

Read More
Butler Cohen served as Construction Manager at-Risk to construct a new ground-up K-8 campus for charter school operator Academica in Austin, Texas.
  • Featured Articles

Beyond the Bid: How Butler Cohen Delivers Solutions, Improves Outcomes and Transforms School Projects Through Design-Bid-Build

1 month ago1 month ago7 mins

Design-Bid-Build, commonly referred to in the construction industry as a “hard bid” project, refers to the construction delivery method commonly utilized by school districts and other education providers, in which the design team is hired directly the owner.

Read More
Designed in collaboration with Elwyn and an integrated design-build team, the new school will serve 260 students across two curriculum tracks: those with complex needs requiring intensive clinical support with onsite residential care and those building toward greater independence.
  • News

Elwyn Breaks Ground on $45 Million School for Students with Disabilities

1 month ago7 mins

Elwyn, a nonprofit human services organization, has launched construction on a new school intended to reshape the organization’s educational and therapeutic space for children with disabilities.

Read More
DC Public Schools' Capitol Hill Montessori | Photo Credit: Tom Holdsworth Photography
  • Featured Articles

Classroom Equity by Design: Bridging the Gap Between Remote and In-Person Learning

1 month ago9 mins

As schools continue to balance in-person and remote learning, equity has become the central design challenge ensuring every student, regardless of where or how they learn, has access to the same quality of accessibility, technology, and experience. 

Read More
The Level X® Play System by Burke is a fitness playground designed for children ages 5-12, with a rated capacity of 110.
  • Products

Fitness Playground

1 month ago1 mins

The Level X® Play System by Burke is a fitness playground designed for children ages 5-12, with a rated capacity of 110.

Read More
Lindsey Perez
  • People

Lindsey Perez Promoted at Little

1 month ago3 mins

Lindsey Perez, AIA, LEED Fellow, GGP, Fitwell Amb., was recently promoted to Community Studio Principal in the Orlando, Fla., office of Little. 

Read More
Murray was excited to see Arlington High School in Massachusetts, a Skanska project, come to fruition in 2025.| Photo Credit: Robert Benson Photography
  • Board Member Spotlight

Board Member Spotlight: Tieg Murray Brings National K-12 and Higher Education Expertise to 鶹

1 month ago1 month ago9 mins

鶹 (SCN) was excited to welcome Tieg Murray to the 2026 Editorial Advisory Board.

Read More
The university said the venue is expected to be ready for the start of the athletic season in fall 2028 and is intended to address space limitations and building-system operations and maintenance challenges at Millett Hall, the current arena.
  • News

Miami University Trustees Approve $242 Million Multipurpose Arena, with Broader Recreation Upgrades Planned

1 month ago1 month ago6 mins

Miami University said the venue is expected to be ready for the start of the athletic season in fall 2028 and is intended to address space limitations and building-system operations and maintenance challenges at Millett Hall, the current arena.

Read More
The A&D Crossfit Teacher Desk & Podium from Paragon Furniture is a flexible instructor workstation designed for modern educational environments.
  • Products

Desk & Podium

1 month ago1 month ago1 mins

The A&D Crossfit Teacher Desk & Podium from Paragon Furniture is a flexible instructor workstation designed for modern educational environments.

Read More
  • 1
  • 2
  • 3

Digital Edition

SCN Digital Edition November December 2025

Digital Edition of the Month
Subscribe
Archives

Our Markets

About Us

Since 1998, 鶹 has been the news magazine devoted specifically to educational facility construction and operations. Readers include several segments of the “building team” including school administrators, facility managers, school board members as well as architects, contractors and suppliers in the field. Special attention is paid to the maintenance/operations and design/construction segments.

Contact Us

  • Sales
  • Editorial
  • Circulation and Billing

Useful Links

  • Subscribe

Copyright © 2026 鶹. All rights reserved.

Get the best of 鶹,
delivered to you.

Top stories, weekly highlights, and free print + digital magazines.

Subscribe
Already a subscriber? Update your details to receive the upcoming print edition →
Absolutely free. Unsubscribe anytime.