鶹

Skip to content
schoolconstructionnews_logo

鶹

Design – Construction – Operations

  • Articles
    • Featured Articles
    • News Articles
    • Products
    • People
  • Subscribe
  • About
    • Contact
    • About 鶹
    • Resource Guide
    • Advertising
    • Industry Partnerships
  • Events
    • Design + Construction Symposium
  • Industry Thought Leaders
    • Editorial Advisory Board
  • Submit Content
Search for:
  • Home
  • New York

Latest Posts

  • Higher Ed Capital Renewal Backlog Rises 8% to $156 Per Gross Square Foot, Report Shows April 14, 2026
  • Students Design Their Own Futures at New STEAM High School April 13, 2026
  • What Rising Safety Concerns Mean for Future School Construction April 7, 2026
  • Vertical Picket Bleacher April 7, 2026
  • Newman University Appoints Aaron Ryder as Director of Facilities April 7, 2026
  • Board Member Spotlight: Aaron Jobson on Energy, Policy and the Evolution of ‘Good School Design’ April 7, 2026
  • San Diego City College Performing Arts Project Enters Schematic Design Phase April 6, 2026
  • LED Downlight April 3, 2026
  • Brendan Kelly Appointed President of Eastern Michigan University April 3, 2026
  • Saban Center Tops Out in Tuscaloosa, Moving STEM-and-Arts Learning Campus Toward 2027 Opening April 2, 2026

New York

In an East Coast STEAM school expansion build-out, school leaders and contractors, along with architects and interior designers from Spacesmith, put the entire high school body in the driver’s seat to design their future. 
  • Featured Articles

Students Design Their Own Futures at New STEAM High School

1 day ago9 mins

In an East Coast STEAM school expansion build-out, school leaders and contractors, along with architects and interior designers from Spacesmith, put the entire high school body in the driver’s seat to design their future. 

Read More
Delivering a major addition on a fully occupied elementary school site in a dense residential neighborhood required precise phasing and operational coordination.
  • Facility of the Month
  • Featured Articles

Facility of the Month: A Contemporary Addition Reimagines New York’s P.S. 87

2 months ago2 months ago12 mins

A 58,000-square-foot expansion at P.S. 87 in the Wakefield section of the Bronx is reshaping both the school’s footprint and its long-term performance.

Read More
Central Queens Academy entrance from the exterior
  • Featured Articles

Central Queens Academy and GLUCK+ Bring New Life to Former Commercial Building

7 months ago7 months ago9 mins

Central Queens Academy leaders and the GLUCK+ team evaluated nearly 100 different properties, eventually selecting a portion of an existing mixed-use structure that includes a community health facility as well as a residential tower, with the school occupying the building’s three expansive podium levels.

Read More
  • News

SUNY Downstate Health Sciences University Invests in Air Handling Upgrades

8 months ago8 months ago6 mins

SUNY Downstate Health Sciences University (DHSU) recently celebrated the completion of a critical update to the facility’s air handling units.

Read More
Construction works, both men and women, dressed in bright vests, stand at a worksite.
  • News

University of Albany Decarbonization Project to Reduce Fossil Fuel Consumption

1 year ago6 mins

University of Albany, one of the four “university centers” of the state’s State University of New York (SUNY) system, recently embarked on a $30 million decarbonization project that will greatly reduce fossil fuel consumption. 

Read More
  • News

Brooklyn Tech Training Center to Serve as Career Pipeline

7 years ago7 years ago4 mins

The doors to the Brooklyn STEAM Center have officially opened; a new hub to provide career technical training to students from eight local NYC public high schools in a rigorous professional setting.

Read More
  • News

New Pre-K Center in Brooklyn Receives Design Award

7 years ago7 years ago4 mins

The new Pre-K Center 613 facility was recently selected as one of the winners of the Concrete Industry Board’s Award of Merit for best design in concrete.

Read More
  • Featured Articles

Stalco Wraps Upgrade at Manhattan Community College Pool and Aquatics Center

7 years ago8 years ago5 mins

General contractor Stalco Construction has completed a $7.2 million renovation of the Borough of Manhattan Community College’s (BMCC’s) aquatics center, including the 220,000-gallon pool.

Read More
  • Featured Articles

Officials Break Ground on East New York School

8 years ago7 years ago5 mins

Mayor Bill de Blasio, Schools Chancellor Richard A. Carranza, Deputy Mayor Alicia Glen, Council Member Rafael Espinal and Brooklyn Borough President Eric Adams have broken ground on a new school facility in East New York.

Read More
  • Featured Articles

The New School Takes on NYC’s Zero Waste Challenge

8 years ago7 years ago5 mins

The New School in New York begs the question: Is there a new lease on life for the urban environment?

Read More
  • 1
  • 2

Digital Edition

SCN Digital Edition November December 2025

Digital Edition of the Month
Subscribe
Archives

Our Markets

About Us

Since 1998, 鶹 has been the news magazine devoted specifically to educational facility construction and operations. Readers include several segments of the “building team” including school administrators, facility managers, school board members as well as architects, contractors and suppliers in the field. Special attention is paid to the maintenance/operations and design/construction segments.

Contact Us

  • Sales
  • Editorial
  • Circulation and Billing

Useful Links

  • Subscribe

Copyright © 2026 鶹. All rights reserved.

Get the best of 鶹,
delivered to you.

Top stories, weekly highlights, and free print + digital magazines.

Subscribe
Already a subscriber? Update your details to receive the upcoming print edition →
Absolutely free. Unsubscribe anytime.